- Home /
- Spare Parts /
- Q-Logic 3/VR2 Electronics /
- Q-Logic 3 Cables /
- Multiplier Box - 2 Short Leads, 1 Long Lead to Power Module
Categories
- Spare Parts
- Quantum Power Bases
- J623 2.0
- Edge 3 Stretto
- Edge 2.0
- Edge 3
- Edge 4
- Edge Z
- Edge HD
- 4Front 2
- 4Front 2HD
- R-Trak
- Outback 4x4
- Q/J-1450
- Quantum Power Positioning
- TB4 Memory Seating System Options (Anterior Tilt & Tilt Only Systems)
- TRU Balance® 4 Anterior Tilt - POSTERIOR TILT, ANTERIOR TILT, LIFT
- TRU Balance® 4 Anterior Tilt - POSTERIOR TILT, ANTERIOR TILT, LIFT - Full Assembly
- TRU Balance® 4 Anterior Tilt - POSTERIOR TILT, ANTERIOR TILT, LIFT - Parts
- TRU Balance® 4 Anterior Tilt - POSTERIOR TILT, ANTERIOR TILT, LIFT - Seat Pans
- TRU Balance® 4 Anterior Tilt - Power Base Interface Assemblies
- Replacement TB4 iLevel Components
- TRU Balance® 4 Posterior Tilt - Tilt Only Base Assembly
- TRU Balance® 4 Anterior Tilt - POSTERIOR TILT, ANTERIOR TILT, LIFT
- REAC (TB3) Lift and Tilt Options
- 12" Elevation & 50 Degrees Posterior Tilt (Suits: J623 2.0, Edge 2.0, Edge3, Edge4, Edge Z)
- 10" Elevation & 50 Degree Posterior Tilt (Suits: 4Front 2, R-Trak, Outback 4x4)
- 10" HD Elevation & 50 Degree Posterior Tilt (Suits: 4Front 2HD, Edge HD)
- TB3 Lift and Tilt - Seat Pans
- REAC (TB3) Lift & Tilt - Universal Interface Assemblies
- Universal Interface Assemblies - Edge4
- Universal Interface Assemblies - Edge3
- Universal Interface Assemblies - Stretto
- Universal Interface Assemblies - J623 2.0
- Universal Interface Assemblies - R-Trak
- Universal Interface Assemblies - 4Front2/HD
- Universal Interface Assemblies - Outback 4x4
- Universal Interface Assemblies - Edge 2.0
- Universal Interface Assemblies - Edge HD
- TB3 Tilt Only Options
- 50 Degree Posterior Tilt Only (Suits All Bases, Excluding: Edge HD, 4Front 2HD, Q/J1450)
- Heavy Duty - 50 Degree Posterior Tilt Only (Suits Edge HD, 4Front2 HD. Excludes j/Q1450)
- TB3 Tilt Only - Universal Interface Assemblies
- TB3 Tilt Interface Assemblies - Edge4
- TB3 Tilt Interface Assemblies - Edge3
- TB3 Tilt Interface Assemblies - Stretto
- TB3 Tilt Interface Assemblies - J623 2.0
- TB3 Tilt Interface Assemblies - R-Trak
- TB3 Tilt Interface Assemblies - 4Front2/HD
- TB3 Tilt Interface Assemblies - Edge 2.0
- TB3 Tilt Interface Assemblies - Edge HD
- Bariatric Tilt - Suits Edge HD, Q/J1450
- TB2 Bariatric Tilt - Version 2
- Bariatric Tilt - Version 3
- TB2 Bariatric Tilt - Full Assembly
- TB2 Bariatric Tilt - Parts
- TB2 Bariatric Tilt - Seat Pans
- 24-28" W x 24-28" D Seat Package - Bariatric Tilt Only
- 28-32" W x 24-28" D Seat Package - Bariatric Tilt Only
- 20-24" W x 16-20" D Seat Package
- 20-24" W x 20-24" D Seat Package
- 24-28" W x 16-20" D Seat Package
- 24-28" W x 20-24" D Seat Package
- 28-32" W x 16-20" D Seat Package
- 28-32" W x 20-24" D Seat Package
- TB4 Memory Seating System Options (Anterior Tilt & Tilt Only Systems)
- Backrest Systems
- Backrest Systems - TB4 Options
- TRU-BALANCE 4 POWER RECLINE WITH FEEDBACK FOR MEMORY SEATING
- TRU-BALANCE 4 POWER RECLINE
- TRU-BALANCE 4 STATIC BACK
- TRU-BALANCE 4 STATIC BACK WITH FLIP FORWARD QUICK RELEASE
- Back Box Shrouds
- Back Box Shrouds - Parts
- Sport & TRU-Comfort Back Pans / Cushions
- Simple Solutions Aftermarket Backrest Interface Plate
- Backrest Systems - Backcane Options
- Backrest Systems - TB4 Options
- Armrests
- Armrests - Flip Back
- Armrests - Frame Mounted
- Front Riggings
- Front Rigging Center Mount
- High Mount Basic Footboard
- Adjustable Center Mount Foot Platform
- Single Actuator Articulating Foot Platform
- Center Mount Power Articulating Foot Platform - Lower Extension is 12.5"
- Center Mount Power Articulating Foot Platform to Ground
- TB4 Center Mount Memory Power Articulating Foot Platform
- Foot Platform Accessories - Excludes Basic Highmount Footboard
- Footplates Only - Excludes Basic Highmount Footboard
- Gel Footplate Covers - Excludes Basic Highmount
- Front Rigging - Swing Away
- 60-90 Degree Swing Away
- Manual Elevating Legrests
- Power Elevating Legrests
- Heavy Duty Drop-in Legrest
- 90 Degree Pediatric Swing Away
- Residual Limb Supports
- Front Rigging Center Mount
- Q-Logic 3/VR2 Electronics
- Specialty Controls
- Joystick Drive Controls
- mo-Vis Micro Joystick (8g Force, 3.3mm Throw)
- PMPJ Joystick (43g Force, 9.6-14.4mm Throw)
- mo-Vis Multi Joystick (50g Force, 3.5mm Throw)
- mo-Vis All-Round Lite Joystick (120g Force, 7mm Throw)
- mo-Vis All-Round Joystick (250g Force, 20mm Throw)
- Mushroom Joystick
- mo-Vis HD Joystick (650g Force, 40mm Throw)
- Head Drive Controls
- Switches
- mo-Vis Foot Control
- mo-Vis Scoot Control
- Tray Drive Controls
- I-Connect Solutions
- mo-Vis Hand Warmer
- I-Drive Accessories/Parts
- Joystick Drive Controls
- Quantum Base & Seating Accessories
- Stealth Products
- Headrests
- Stealth Cushions
- Cushions
- Coolcore Covers
- incontinence Liners
- Upper Body Supports
- Lower Body Supports
- Pelvic Belts
- ADI Products
- UniLink Positioning Supports
- EPiC
- Gel Ovations
- Tools/Maintenance
- Quantum Power Bases
Multiplier Box - 2 Short Leads, 1 Long Lead to Power Module
Display per page
